Shandong Laizhou Sanshandao Gold Mine 4000m Test Borehole
Release time:
2024-10-18
|
|
2013 Shandong Geological Team 3 |
|||
| Geological Design |
1. Design depth 4000m, final hole diameter water ≤ 75 m, core diameter water ≤ 46 m |
|||
| Final hole |
Construction from September 2010 to May 2013, depth 4006.17m, aperture 75mm, core diameter 46mm, adoption rate ≤ 95% |
|||
| Equipment |
Drilling platform, vertical shaft drilling rig |
|||
| Formation information |
Precambrian basement rocks and ultra-high pressure metamorphic rock blocks consisting of Mesozoic tectonics and endogenic hydrothermal gold deposits with strong magma development |
|||
| Construction characteristics |
Using φ60.3 once through drill pipe φ75 rope drill pipe combination drill pipe string to complete the final hole depth (drill pipe string upper 1200m common |
|||
| Drilling process scheme |
Drilling tool configuration |
Process technology point |
||
| open |
Opening:The full drilling depth of φ170 bit is 32.80m |
φ168 core tube φ170 alloy bit |
1. H□ diameter (JS95B) drill pipe deep head |
|
| Orifice tube: depth approx.32.80m |
φ168 sleeve boot |
|||
| Second opening |
Drilling in:φ150 diamond core drilling |
JS150 drilling tool φ150 diamond bit |
||
| Technical casing: depth approx.81.29m |
φ146 sleeve boot |
|||
| Three open |
Drilling in:φ122 diamond rope core drilling |
JS122 drilling tool φ122 diamond bit |
||
| Technical casing: depth approx.501.00m |
φ114 casing boot |
|||
| Four open |
Drilling in:2230~2672 m, with φ75 diamond |
φ75 drilling tool φ75 diamond bit, |
|
|
| Technical casing: depth approx.2439.10m. |
φ89 sleeve boot |
|||
| Five open |
Drilling in:φ75 diamond wire coring drilling to final hole |
φ60.3 ordinary drill pipe φ75 rope drill pipe |
||