Anhui Huoqiu Iron Mine
Release time:
2024-10-16
| 2010 Anhui 313 Geological Team |
||||
| Geological Design |
1. Design depth 1500 m, final hole diameter ≤ 75mm, core diameter ≤ 46 mm |
|||
| Overview of final hole |
Construction from 2009 to 2010.6 months, depth 2706.68 m, aperture 77mm; core diameter 46mm, take rate 99.38; |
|||
| Equipment |
FYD-2200 type split tower full hydraulic power head drilling rig |
|||
| Formation information |
Iron ore, surface Quaternary loose strata, accompanied by crushing, collapse, water leakage, water gushing and other geological conditions |
|||
| Construction characteristics |
The formation is complex, into the four layers of technical casing protection wall, the use of reaming technology. |
|||
| Drilling process scheme |
Drilling tool configuration |
Process technology point |
||
| open |
Opening:φ110 single-tube alloy drill core drilling |
φ110 single-pipe drilling tool φ168/110 |
1, guide reaming drill reaming process, guarantee |
|
| Orifice tube: depth approx.247.83m |
φ146 sleeve boot |
|||
| Second opening |
Drilling in:φ130 single-tube diamond drilling coring extension |
φ127 Single Pipe Drilling Tool φ130 King Kong |
||
| Technical casing: depth approx.256.53m |
φ127 sleeve boot |
|||
| Three open |
Drilling in:φ96 diamond rope core drilling |
φ96 drilling tool φ110/96 King Kong |
|
|
| Technical casing: depth approx.282.52m |
φ108 sleeve boot |
|||
| Four open |
Drilling in:φ97 diamond rope coring |
φ89 drill pipe φ97 drill tool |
||
| Technical casing: depth approx.1230.37m。 |
φ89 sleeve boot |
|||
| Five open |
Drilling in:φ77 diamond rope core drilling |
φ77 drilling tool φ77 diamond bit |
||