Chongqing Wuxi Shale Gas Luye 1# Well
Release time:
2024-10-18
| 2021 Chongqing One Three Six Minerals Company |
||||
| Geological Design |
Well number: JKZ-1, design hole depth 1950.0m, coring diameter 102mm |
|||
| Overview of final hole |
Construction from August 2020 to July 2021, depth 2555.18 m, aperture 127mm, core diameter 80mm |
|||
| Equipment |
Large DB30 intelligent drilling rig, drilling platform, blowout preventer |
|||
| Formation information |
Upper sandy mudstone and silty sandstone, central dolomite and limestone, lower granite, black penstone shale |
|||
| Construction characteristics |
Open-hole Ordovician and Cambrian strata; loose, broken, falling and collapsed strata are easy to get stuck in drilling; water gushing, water leakage, |
|||
| Drilling process scheme |
Drilling tool configuration |
Process technology point |
||
| open |
openings: openingsO216 single pipe drilling tool |
0216 diamond drill bit |
1. Ensure drilling accuracy and avoid diameter reduction |
|
|
|
Orifice tube: depth approx.35m |
0178 casing |
||
| Second opening |
Drilling in:JS150 wireline coring tool |
JS150 drilling tool JS150 diamond bit |
||
|
|
Technical casing: depth approx.1500m |
O146 casing 0146 boot |
||
| Three open |
Drilling in:CHD127 rope core drilling |
CHD127 rope core drilling tool CHD127 |
||
|
|
||||
| Carcass typePD Drill Bit Gear Drill Bit |
||||