Jiama Copper Polymetallic Ore, Tibet
Release time:
2024-10-18
| 2020 Shandong Geological Team 3 |
||||
| Geological Design |
Design depth3000m, final hole diameter ≤ 95mm, core diameter ≤ 60mm |
|||
| Overview of final hole |
Construction from June 2019 to October 2020, with a depth of 3003.33m and an aperture of 98mm; core diameter of 63mm, with an adoption rate of 99.38 per cent; |
|||
| Equipment |
drilling platform,HXY-8VB type frequency conversion hand-automatic integrated drilling rig |
|||
| Formation information |
0-650m corner rock is the main, 650-1100m skarn, skarn marble is the main, 1100m deep to two long granite porphyry is the main, |
|||
| Construction characteristics |
1. The mining roadway in the work area is vertical and horizontal, and the drilling track is strictly controlled to avoid drilling into the mine roadway. |
|||
| Drilling process scheme |
|
Process technology point |
||
| open |
Opening:φ220 single tube core to 6.50m, |
φ220 diamond bit 0240 rib |
1, throw yellow mud ball to plug the leakage protection hole |
|
| Orifice tube: depth approx.6.5m |
φ219 sleeve boot |
|||
| Second opening |
Drilling in:φ175 single pipe drilling 57.49m |
φ175 single-tube diamond bit |
||
| Technical casing: depth approx.57.49m |
φ168 sleeve boot |
|||
| Three open |
Drilling in:φ150 /122 "Integrated Drilling and Expansion" |
φ150/122 "Drilling and Expansion Integration" Gold |
||
| Technical casing: depth approx.224.5m |
φ140 sleeve φ140 pipe shoe |
|||
| Four open |
Drilling in:φ122 diamond rope drilling |
φ122 drill pipe φ122 drilling tool |
||
| Technical casing: depth approx.1075m |
φ114 drill pipe drill pipe boots |
|||
| Five open |
Drilling in:φ98 rope drilling to the final hole |
φ95 drilling tool φ98 bit |
||
![]() |
||||
| Drilling structure diagram of five-opening design φ122/150 "drilling and expanding integrated" drill bit |
||||