Surface vertical shaft drilling rig (oil pores, shale pores)
Release time:
2018-07-13
|
specific conditions |
Rig |
Design hole depth (m) |
Final hole diameter |
Core diameter mm |
Remarks |
|||||
|
Vertical shaft drilling rig |
≤2400 |
H |
63.5 |
|||||||
|
Drilling tool grading scheme |
1,C219 casing is equipped with C219 casing bit, drilling 30-50m to stable rock formation; C219Sleeve installation sleeveC219 Casing shoe, for wellhead wall protection casing; |
|||||||||
|
2,SW casing is equipped with SW casing bit, drilling 100~200m to stable rock formation; SWSleeve InstallationSW casing shoe, make technical casing; |
||||||||||
|
3,JS150 drill pipe shall be equipped with SQ rope drilling tool, with drilling depth greater than 600m to stable rock formation; |
||||||||||
|
4,C146 Sleeve Install C146 sleeve shoe and make technical sleeve; |
||||||||||
|
5,XJS122 drill pipe shall be equipped with XJS122 rope drilling tool (the drill bit shall be enlarged), and drill 1200~1500m to stable rock formation; |
||||||||||
|
6,Install HW casing shoe and make technical casing; Or complex formation XJS122 drill pipe directly to do technical casing; |
||||||||||
|
7,XJS98 drill pipe shall be equipped with JSHQ rope drilling tool, and the drilling depth shall reach the final hole; |
||||||||||
|
8,CHD76 drill pipe is equipped with CHD76 rope drilling tool as standby level. |
||||||||||
|
Table of Material Selection of Backing Drilling Tools |
||||||||||
|
Classification |
Serial Number |
Name |
Standard |
Quantity |
Unit |
Remarks |
||||
|
Drill Casing |
1 |
1MetersC219 Casing |
C219 |
1 |
Root |
|||||
|
2 |
3MetersC219 Casing |
C219 |
16 |
Root |
||||||
|
3 |
3MetersSW Sleeve |
SW |
35 |
Root |
||||||
|
4 |
4.5MetersC146 Sleeve |
C146 |
200 |
Root |
||||||
|
5 |
4.5MetersHW casing |
HW |
335 |
Root |
Customized |
|||||
|
6 |
3MetersJS150 drill pipe |
JS150 |
200 |
Root |
||||||
|
7 |
4.5MetersXJS122 drill pipe |
XJS122 |
335 |
Root |
||||||
|
8 |
4.5MetersXJS98 drill pipe |
XJS98 |
535 |
Root |
||||||
|
Drilling tools |
1 |
3m rope drilling tool |
SQ |
1 |
Sleeve |
|||||
|
2 |
3m rope drilling tool |
XJS122 |
2 |
Sleeve |
||||||
|
3 |
3m rope drilling tool |
JSHQ |
2 |
Sleeve |
||||||
|
4 |
Sliver |
SQ |
1 |
Sleeve |
||||||
|
5 |
Sliver |
XJS122 |
1 |
Sleeve |
||||||
|
6 |
Sliver |
HQ |
2 |
Sleeve |
||||||
|
Diamond Products |
1 |
diamond casing drill bit |
C219 |
2 |
Only |
|||||
|
2 |
diamond casing drill bit |
SW |
5 |
Only |
||||||
|
3 |
diamond drill bit |
SQ |
6 |
Only |
||||||
|
4 |
diamond reamer |
SQ |
4 |
Only |
||||||
|
5 |
diamond drill bit |
XJS122 |
10 |
Only |
||||||
|
6 |
diamond reamer |
XJS122 |
5 |
Only |
||||||
|
7 |
diamond drill bit |
HQ 2 |
10 |
Only |
||||||
|
8 |
diamond reamer |
HQ 2 |
6 |
Only |
||||||
|
9 |
diamond casing shoe |
C219 |
1 |
Only |
||||||
|
10 |
diamond casing shoe |
SW |
1 |
Only |
||||||
|
11 |
diamond casing shoe |
C146 |
1 |
Only |
||||||
|
12 |
diamond casing shoe |
HW |
1 |
Only |
||||||
|
13 |
diamond drill rod boots |
XJS122 |
1 |
Only |
Options |
|||||
|
Drilling Casing Unscrewing System |
1 |
Casing free clamp |
ZYQ-219 |
2 |
Put |
|||||
|
2 |
Casing free clamp |
ZYQ-146/168 |
2 |
Put |
||||||
|
3 |
drill pipe free tong |
ZYQ-139 |
4 |
Put |
||||||
|
5 |
drill pipe free tong |
ZYQ-114 |
4 |
Put |
||||||
|
6 |
drill pipe free tong |
ZYQ-89 |
4 |
Put |
||||||
|
7 |
inner tube free clamp |
ZYQ-118N |
2 |
Put |
||||||
|
8 |
inner tube free clamp |
ZYQ-91N |
4 |
Put |
||||||
|
9 |
inner tube free clamp |
ZYQ-73N |
4 |
Put |
||||||
|
rope winch |
1 |
rope winch |
JS-3000D |
1 |
Taiwan |
|||||
|
2 |
wire rope |
9.0 |
2500 |
Meters |
||||||
|
Faucet system |
1 |
Faucet |
JS-04 |
1 |
One |
|||||
|
2 |
High pressure hose |
GYJG-38 |
1 |
Root |
||||||
|
Drilling casing lifting system |
1 |
elevator lifter |
1 |
One |
Customized |
|||||
|
Main Consumable Materials |
1 |
Small package of wearing parts |
SQ |
1 |
Sleeve |
|||||
|
2 |
………. |
|||||||||
|
Note: Other supplementary materials and consumable materials, which are not included above, are described with the material list. |
||||||||||
